Adelanto Converter Station in Adelanto, California is the southern terminus of the 2,400 MW Path 27 Utah–California high voltage DC power (HVDC) transmission line. The station contains redundant thyristor-based HVDC converters rated for 1,200 MW continuous or 1,600 MW short term overload.〔 The station was completed in July, 1986 at a cost of US$131 million.〔 The northern terminus of Path 27 is fossil fueled Intermountain Power Plant in Utah. An adjacent $45 million AC switching station owned by Los Angeles Department of Water and Power links to the Southern California grid via five 500-kV AC lines.〔 ABB, who had built the station in 1986, upgraded its original 1,600 MW capacity to 2,400 MW in 2011.〔 In 2012, an 11.4 MW solar array (less than 1% of the Utah plant's capacity) was installed at the facility at a cost of $48 million obtained with loans subsidized by the American Recovery and Reinvestment Act of 2009.〔 ==Interconnects== Adelanto substation is connected to the following via 500 kV AC lines:〔 *Marketplace substation in Nevada via Path 64 *Victorville Switching Station (two lines) *RS-E in the eastern San Fernando Valley *RS-Rinaldi in the northern San Fernando Valley 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Adelanto Converter Station」の詳細全文を読む スポンサード リンク
|